a

work

Oak Point Golf Club

This project involves the supply and installation of Alspec EcoframPlus windows with specific glazing specifications, including the provision of engineering calculations, access equipment, and site management.

a

work

Oak Point Golf Club

This project involves the supply and installation of Alspec EcoframPlus windows with specific glazing specifications, including the provision of engineering calculations, access equipment, and site management.

a

work

Oak Point Golf Club

This project involves the supply and installation of Alspec EcoframPlus windows with specific glazing specifications, including the provision of engineering calculations, access equipment, and site management.

a

work

Oak Point Golf Club

This project involves the supply and installation of Alspec EcoframPlus windows with specific glazing specifications, including the provision of engineering calculations, access equipment, and site management.

client Icon
client Icon
client Icon

client

FDC
service-icon
service-icon

service

Glazing Refurb Works
location-icon

location

198-228 Hollywood Drive, Lansvale, NSW
categories-icon

category

Commercial
completed-icon

completed

In Progress

Project Overview

Detailed Case Study

Scope of Works and Services:

The project, "Oak Point Golf Club - Glazing Replacement," outlines a detailed scope of work for the client FDC. The core of the work involves supplying and installing a new glazing system.

  • Glazing Supply and Installation: The key component of the project is the supply and installation of an Alspec EcoframPlus window system. The glazing specified is a 6mm Clear Tghd/12 Argon/6 Clear Tghd DGU Low E glass. This includes all necessary powder coating and is based on the scope highlighted in the provided markup.


  • Engineering and Access: The scope includes providing engineering calculations for the structural and wind loads on the new glazing system. The project also requires a 305 Maeda crane and a small knuckle boom lift for access.


  • Management and Logistics: A portion of the quoted amount is allocated for management and logistics, which covers the coordination and oversight of the work on site.


Exclusions and Notations:

The quotation explicitly details several exclusions and important notes:

  • Glazing System: The quoted amount for the glazing does not include any thermal, acoustic, or weatherproofing works or certifications.


  • Access and Site Conditions: The quote specifies that access equipment is a separate item. Other exclusions include work performed after hours, on weekends, or on public holidays unless a specific request is made at the time of the tender. Any additional work outside the agreed-upon scope will be charged at an hourly rate, which must be signed off on by FDC.


  • Demolition and Waste: The supply and installation of plywood to cover up the opening until glazing is completed is not included in the price. The quote also explicitly excludes the removal or disposal of glass and other materials from the site, with FDC responsible for providing the bins.


  • Documentation: No shop drawings, design, or engineering certifications were included in the price.


  • Timeframe and Payment: The estimated time for the work is 4-6 weeks from the approval date of the quotation. The payment terms are 14 days after the invoice is sent, and the client has specified that no retention or bank guarantee is accepted.


  • Responsibility: Security for the work area while the project is ongoing will be the responsibility of FDC.

Detailed Case Study

Scope of Works and Services:

The project, "Oak Point Golf Club - Glazing Replacement," outlines a detailed scope of work for the client FDC. The core of the work involves supplying and installing a new glazing system.

  • Glazing Supply and Installation: The key component of the project is the supply and installation of an Alspec EcoframPlus window system. The glazing specified is a 6mm Clear Tghd/12 Argon/6 Clear Tghd DGU Low E glass. This includes all necessary powder coating and is based on the scope highlighted in the provided markup.


  • Engineering and Access: The scope includes providing engineering calculations for the structural and wind loads on the new glazing system. The project also requires a 305 Maeda crane and a small knuckle boom lift for access.


  • Management and Logistics: A portion of the quoted amount is allocated for management and logistics, which covers the coordination and oversight of the work on site.


Exclusions and Notations:

The quotation explicitly details several exclusions and important notes:

  • Glazing System: The quoted amount for the glazing does not include any thermal, acoustic, or weatherproofing works or certifications.


  • Access and Site Conditions: The quote specifies that access equipment is a separate item. Other exclusions include work performed after hours, on weekends, or on public holidays unless a specific request is made at the time of the tender. Any additional work outside the agreed-upon scope will be charged at an hourly rate, which must be signed off on by FDC.


  • Demolition and Waste: The supply and installation of plywood to cover up the opening until glazing is completed is not included in the price. The quote also explicitly excludes the removal or disposal of glass and other materials from the site, with FDC responsible for providing the bins.


  • Documentation: No shop drawings, design, or engineering certifications were included in the price.


  • Timeframe and Payment: The estimated time for the work is 4-6 weeks from the approval date of the quotation. The payment terms are 14 days after the invoice is sent, and the client has specified that no retention or bank guarantee is accepted.


  • Responsibility: Security for the work area while the project is ongoing will be the responsibility of FDC.

Detailed Case Study

Scope of Works and Services:

The project, "Oak Point Golf Club - Glazing Replacement," outlines a detailed scope of work for the client FDC. The core of the work involves supplying and installing a new glazing system.

  • Glazing Supply and Installation: The key component of the project is the supply and installation of an Alspec EcoframPlus window system. The glazing specified is a 6mm Clear Tghd/12 Argon/6 Clear Tghd DGU Low E glass. This includes all necessary powder coating and is based on the scope highlighted in the provided markup.


  • Engineering and Access: The scope includes providing engineering calculations for the structural and wind loads on the new glazing system. The project also requires a 305 Maeda crane and a small knuckle boom lift for access.


  • Management and Logistics: A portion of the quoted amount is allocated for management and logistics, which covers the coordination and oversight of the work on site.


Exclusions and Notations:

The quotation explicitly details several exclusions and important notes:

  • Glazing System: The quoted amount for the glazing does not include any thermal, acoustic, or weatherproofing works or certifications.


  • Access and Site Conditions: The quote specifies that access equipment is a separate item. Other exclusions include work performed after hours, on weekends, or on public holidays unless a specific request is made at the time of the tender. Any additional work outside the agreed-upon scope will be charged at an hourly rate, which must be signed off on by FDC.


  • Demolition and Waste: The supply and installation of plywood to cover up the opening until glazing is completed is not included in the price. The quote also explicitly excludes the removal or disposal of glass and other materials from the site, with FDC responsible for providing the bins.


  • Documentation: No shop drawings, design, or engineering certifications were included in the price.


  • Timeframe and Payment: The estimated time for the work is 4-6 weeks from the approval date of the quotation. The payment terms are 14 days after the invoice is sent, and the client has specified that no retention or bank guarantee is accepted.


  • Responsibility: Security for the work area while the project is ongoing will be the responsibility of FDC.

Detailed Case Study

Scope of Works and Services:

The project, "Oak Point Golf Club - Glazing Replacement," outlines a detailed scope of work for the client FDC. The core of the work involves supplying and installing a new glazing system.

  • Glazing Supply and Installation: The key component of the project is the supply and installation of an Alspec EcoframPlus window system. The glazing specified is a 6mm Clear Tghd/12 Argon/6 Clear Tghd DGU Low E glass. This includes all necessary powder coating and is based on the scope highlighted in the provided markup.


  • Engineering and Access: The scope includes providing engineering calculations for the structural and wind loads on the new glazing system. The project also requires a 305 Maeda crane and a small knuckle boom lift for access.


  • Management and Logistics: A portion of the quoted amount is allocated for management and logistics, which covers the coordination and oversight of the work on site.


Exclusions and Notations:

The quotation explicitly details several exclusions and important notes:

  • Glazing System: The quoted amount for the glazing does not include any thermal, acoustic, or weatherproofing works or certifications.


  • Access and Site Conditions: The quote specifies that access equipment is a separate item. Other exclusions include work performed after hours, on weekends, or on public holidays unless a specific request is made at the time of the tender. Any additional work outside the agreed-upon scope will be charged at an hourly rate, which must be signed off on by FDC.


  • Demolition and Waste: The supply and installation of plywood to cover up the opening until glazing is completed is not included in the price. The quote also explicitly excludes the removal or disposal of glass and other materials from the site, with FDC responsible for providing the bins.


  • Documentation: No shop drawings, design, or engineering certifications were included in the price.


  • Timeframe and Payment: The estimated time for the work is 4-6 weeks from the approval date of the quotation. The payment terms are 14 days after the invoice is sent, and the client has specified that no retention or bank guarantee is accepted.


  • Responsibility: Security for the work area while the project is ongoing will be the responsibility of FDC.

b

gallery

Project Gallery

b

gallery

Project Gallery

b

gallery

Project Gallery

b

gallery

Project Gallery

c

explore

Explore More Projects

c

explore

Explore More Projects

c

explore

Explore More Projects

c

explore

Explore More Projects

Cta Image

We are always open to collaboration and happy to welcome new projects.

Cta Image

We are always open to collaboration and happy to welcome new projects.

Cta Image

We are always open to collaboration and happy to welcome new projects.

Cta Image

We are always open to collaboration and happy to welcome new projects.